Summary of ShopBot's PRS Maintenance Schedule and the maintenance appendix; the full published schedule, with the rack-greasing and bearing-adjustment procedures, is below.[2,13]
- C5 warm-up at the start of the day
- Vacuum deck, brush racks and rails
- Check the brush skirt and that the hose is on the foot
- Listen: ticks and bumps are debris
- Record material, cutter, feed, rpm and faults in your job notes; report problems
- Wipe rails, light grease on the racks (BB-sized dab per 6 in, work in, wipe excess)
- Check pinion set screws and motor spring tension
- Check collet, nut and spindle nose for scoring
- Roller/eccentric preload on the car and Z
- Rack and pinion wear, re-engagement
- Cable carriers and connectors
- VFD fan runs
- Check gantry square (diagonal test), table flatness
- Spoilboard surfacing
- Proximity switch gap and function
- Replace collets at 400–700 h or any incident
Why maintenance matters here
Students clean accessible surfaces, inspect tooling and report faults. Mechanical adjustments, lubrication and servicing are staff tasks.
- Daily: C5 warm-up and listen for the fan; inspect bit, collet, nut, hose; check alignment without pushing the gantry; tell staff if it is out of square. Jog, C3, C2.[13,4]
- Every 40 h: brush X/Y/Z racks and pinions, then a BB-sized blob of light grease every 6 in, run the axes ~10 times, wipe the excess; Scotchbrite + WD-40 on the V-rails, brass brush on the rollers; push-pull play check at every drive.[13]
- Quarterly / semiannually: spin-test rollers, tighten pinion set screws, check Z eccentrics and spindle square; back up settings with US (restore with UR).[13,18]
- Semiannually at 40 h/week: all pinions replaced, Z extrusion stripped, cleaned and re-set, collets replaced as required.[13]
The published schedule, in full
Students clean accessible surfaces, inspect tooling and report problems. Mechanical adjustments, electrical checks, lubrication and servicing below are staff tasks, not permission to power down or open the machine.
Daily, before cutting [MS 3]
- Run C5 (9000, 10 000 and 12 000 rpm for 3 min each). Confirm the spindle fan runs.
- Check the bit, collet and collet nut for wear and debris. Keep the spindle body, fans and airways clean. Tapers, shafts and collets must be scrupulously clean. Use the tightening method demonstrated during induction; do not substitute a torque for another nut.
- Square the gantry against the end stops, hold it there, and press reset.
- Push-pull test each motor area: X1, X2, Y, Z. A slight click is acceptable, but no movement beyond a few thousandths. If there is play, adjust the motor-mount spring (3½ turns after slack is removed) and/or tighten the set screws.
- Move the machine around at both M and J speeds, or run a short warm-up routine.
- Run C3.
- Run C2.
- Verify the zero with MZ,0 over the surface.
- Visually inspect the machine, wiring, dust hoses and table.
- Check that the dust collector works.
Also daily [QS 18]:
- Clean bits with solvent and discard dull or damaged ones.
- Check cables for cuts and pinch points.
- Keep the rails and gear racks clear of chips.
Every 40 h of use [MS 3]
- Rack greasing: Clean the X, Y and Z racks and pinions with a small brush. Add a BB-sized blob of light grease every 6″. Run each axis to its extents about 10 times. Wipe off the excess and redo the X/Y push-pull test.
- Clean the Z-assembly V-bearing edges with Scotch-Brite and WD-40, then wipe with light grease or machine oil. Clean and adjust the V-rollers as needed.
- Scrub the X and Y V-rails with Scotch-Brite soaked in WD-40, then wipe clean. Clean roller buildup with a small brass brush.
- Repeat the push-pull test and adjust the motor-mount springs (3½ turns past contact) or set screws.
Grease (staff):
- MS says light grease [MS 3].
- TM recommends heavy automotive or industrial grease [TM 7].
- UG says any regular bearing grease, and that grease does not trap debris badly [UG 63].
- The Quick-Start, by contrast, says to remove excess grease from the collet and nut, so keep grease off tooling [QS 15].
Monthly (from Troubleshooting Mechanicals)
- Drop and re-engage the X and Y pinions, at least monthly or whenever there is play. Press with 15–20 lb while tightening the 4 motor-plate screws [TM 4–5].
- Check that the YZ-car lower rollers are seated [TM 9].
- Check that the spindle is tight in its bracket [TM 17].
Quarterly (40 h/week) to semi-annual (20 h/week): everything above, plus [MS 3–4]
- With the motors removed or disengaged from the racks, move each axis through its full travel. Check for looseness or binding.
- With the motors removed, spin-test every X and Y car V-roller.
- Tighten all pinion set screws. Replace pinions and key stock if they show movement.
- Adjust the Z-axis V-roller bearing eccentrics with the provided flat wrench.
- Check the spindle is square and aligned.
- Remove the lower YZ-car V-roller dust covers and adjust the eccentrics.
- Update software and firmware.
- Back up settings with US (a
C:\SB BKUPfolder exists if ShopBot did a support visit). Restore with UR.
Semi-annual (40 h/week) to annual (20 h/week): everything above, plus [MS 4]
- Replace all pinions. TM also says pinions are consumables, to be replaced every 6–12 months [TM 7].
- Remove, clean, inspect, reassemble, lubricate and adjust the complete Z extrusion assembly.
- Replace the collets, and the collet nuts if they are damaged.
Z bearing adjustment outline (staff task)
- Too loose: the top or lower bearings spin freely and do not touch the inner captured rail. The Z axis shows sideways "slop" [TM 18].
- Too tight: Z loses steps, binds or stops abruptly. The inner rail wears early [TM 18].
- Adjust the eccentrics with the flat wrench a little at a time [MS 4]. The full procedure is ShopBot's "Adjust PRS Z Car Bearings" document [TM 18].
- Uneven or slanted step-downs: first check the spindle is tight in its bracket, then the Z bearings [TM 17].
YZ-car lower wheel adjustment outline (staff task)
- Test: grip the bottom of the YZ car and pull it toward you. It must not move away from the cross-beam [TM 9].
- Symptom when wrong: a part cuts correctly on 3 sides with a bad 4th side, consistent with cut direction [TM 9].
- Hint: drop the Y pinion out of the rack first, so you can feel how freely the car rolls while held against the beam. Re-engage the pinion afterwards [TM 10].
- Adjustment: the two lower bearings have eccentric nuts. Rotate each slightly counter-clockwise to tighten [UG 64]. The full procedure is "Adjusting the Lower Wheels on the YZ car" [TM 10].
Squareness check
- Cut or scribe a large rectangle (for example 30″×50″) and compare the diagonals. They should be equal [TM 19].
- If they differ, first re-square the gantry against the end stops [TM 19–20].
Commands, signals and sources
Command glossary
| Command | Meaning | Src |
|---|---|---|
| MS | Set Move (feed) speed, XY/Z/A/B, in/s or mm/s | [CR 20] |
| JS | Set Jog (rapid) speed, XY/Z/A/B | [CR 16] |
| VS | Set all 8 move and jog speeds in one sheet | [CR 42] |
| TR | Opens Spindle RPM Control; TR,n requests n RPM in a file (SB3.5.5+) | [QS 15–16] |
| C2 | Z-zero with the plate (input 1): two touches, then pull-up | [QS 14] |
| C3 | XY homing using the proximity switches (inputs 2/3) | [QS 15; UG 20] |
| C5 | Spindle warm-up: 9000/10000/12000 RPM for 3 min each, then off | [QS 16] |
| C6, C7, C9 | Custom-cut slots. Student procedures use the standard C2, C3 and C5 routines. Do not remove C-commands from posted files | — |
| JZ | Jog Z to a location (or by a distance in relative mode) | [CR 17] |
| JH | Safe-Z, then jog to XY 0,0 | [CR 17] |
| J2 | Jog X,Y at Jog speed | [CR 15] |
| J3 | Jog X,Y,Z at Jog speed | [CR 16] |
| M2 / M3 | Move XY / XYZ at Move (cutting) speed | [CR 17–18] |
| MZ | Move Z at Move speed (MZ,0 checks Z zero) | [CR 21; TM 11] |
| SA / SR | Absolute / relative distances; use absolute in part files | [CR 25; CR 28] |
| VD | Display values: linear units 0 = in, 1 = mm (3rd field), keypad fixed distance, logs | [CR 35; UG 21] |
| VL | Staff only: table limits in base coordinates, plus a limit-check flag | [CR 38; UG 20] |
| VN | Staff only: input assignment: limits on/off, input 4 stop mode, input modes | [CR 38–39] |
| VI | Comm port and driver channel settings (staff only) | [CR 37] |
| VO | Temporary tool offset (dual Z / air drill) | [CR 40] |
| SO | Set output n on/off: SO,1,1 = output 1 on | [CR 27; UG 48] |
| SK (K) | Keypad arrow control; Move mode only | [CR 26] |
| ZZ | Zero Z here (reference only; students use C2) | [CR 45] |
| Z2 | Zero X and Y here | [CR 43] |
| Z3 | Zero X, Y and Z here | [CR 44] |
| ZX / ZY | Zero X only / Y only | [CR 44–45] |
| ZT | Staff only. Redefines the table base coordinates that limit checking and C3 rely on; never use it for a job origin (use Z2). ST resets the working display to base | [CR 44; CR 28] |
| FP | Load and run a part file (fill-in sheet: proportion, reps, offset, tabs) | [CR 12] |
| FG | Run a file in Goto/single-step mode; resume from the last line | [CR 11] |
| SP / SM | Preview mode / Move-Cut mode | [CR 28; CR 27] |
| PAUSE | In a file: wait for a key (PAUSE n = n seconds) | [UG 27] |
| CN,90 | Calls custom cut 90; the CAM post uses it to expose controller variables for a units check | [54] |
| &var | Part-file variable, e.g. &Zdepth = -0.52 then MZ,&Zdepth | [UG 28] |
| MO | Staff only: motors off and all outputs off. Not an end-of-job command | [CR 20] |
| TS | Staff only: ShopBot Setup: plate thickness, prox-switch offsets | [CR 30; TM 12] |
| SF | Staff only: file and move limit checking on/off | [CR 26] |
Inputs, outputs and status LEDs
| I/O | Function on this machine | Src |
|---|---|---|
| Input 1 | Z-zero plate. Lights when bit and plate touch | [QS 14] |
| Input 2 | X proximity switch, configured as a limit (VN) | [CR 39; UG 46] |
| Input 3 | Y proximity switch, configured as a limit (VN) | [CR 39; UG 46] |
| Input 4 | Stop circuit. On an alpha: normally-closed E-stop, wired ES1–ES4; cannot be reassigned | [CR 39; UG 47] |
| Input 5 | Z proximity switch | [2] |
| Output 1 | Spindle/router (on an alpha, used with the pendant Start) | [QS 12–13; UG 74–75] |
| Output 4 | Safety/"tool active" output; on during motion and with the keypad open | [CR 27; UG 48; QS 12] |
Reading the indicators
- An active input turns green in the input section of the Position window [UG 46].
- Output 4 lights when the keypad opens [QS 12]. Its default mode is −1: on with the warning signal before a move, off at the end of it [CR 27].
- Inputs are 5 V TTL. An input reads ON when pulled to ground, which is why the Z-plate clip closes input 1 [UG 46].
- Outputs are 5 V TTL, about 5 mA. They signal relays and must not power accessories directly [UG 47].
- Motor driver LEDs (alpha AS-type drivers): green OPERATION, red ALARM. The red LED blinks a fault code.
Sources
- ShopBot PRSalpha Specifications, JUL 2023 (FabLab Nepal mirror) — https://www.fablabnepal.org/storage/uploads/66f01f7b-e155-498b-b9c1-ededefd3f47d/PRSalphaSpecSheet_JUN2023.pdf
- ShopBot SBG00443 PRSalpha Assembly Guide, May 2022 (incl. dust-foot and maintenance appendices) — https://shopbottools.com/wp-content/uploads/2024/01/SBG00443_PRSalpha_Assembly.pdf
- ShopBot PRS Assembly Manual, legacy edition — https://wiki.makesantafe.org/shopbotassembly.pdf
- ShopBot Quick-Start Guide, PRSalpha and PRSstandard, Oct 2016 — https://shopbottools.com/wp-content/uploads/2024/01/QuickstartGuidePRSAlphaStandard.pdf
- ShopBot Technical Q&A / FAQ (Z-zero plate, connections, RPM controller, XY homing) — https://shopbottools.com/support-resources/faq
- ShopBot Communication Issues FAQ — https://shopbottools.com/ufaq/communication-issues
- ShopBot Command Reference, Control Software and OpenSBP, 2015 — https://shopbottools.com/wp-content/uploads/2024/01/SBG00253150707CommandRefV3.pdf
- ShopBot SBG00142 User Guide, March 2015 — https://shopbottools.com/wp-content/uploads/2024/01/SBG-00142-User-Guide-20150317.pdf
- ShopBot Holding Down Material for Cutting, Aug 2016 — https://shopbottools.com/wp-content/uploads/2024/01/holdingdown.pdf
- ShopBot PRS Maintenance Schedule, Sept 2016 — https://shopbottools.com/wp-content/uploads/2024/01/PRSMaintenanceSchedule.pdf
- ShopBot Replacing Pinion Gears — https://shopbottools.com/wp-content/uploads/2024/01/SBG00264_Replacing_Pinion_Gears-2.pdf
- ShopBot SBG00203 Troubleshooting Mechanicals, Oct 2014 — https://shopbottools.com/wp-content/uploads/2024/01/SBG-00203-TroubleShooting-Mechanicals-2014-10-24.pdf
- ShopBot Static Reduction in CNC Dust Collection Systems — https://shopbottools.com/wp-content/uploads/2024/01/Static_Reduction_in_CNC_Dust_Collection_Systems.pdf
- ShopBot Adjusting the PRS Z-Axis Bearings, Oct 2016 — https://shopbottools.com/wp-content/uploads/2024/01/AdjustPRSZBearings.pdf
- ShopBot Adjusting the Lower Wheels on the YZ-Car — https://shopbottools.com/wp-content/uploads/2024/01/Adjusting-the-Lower-Wheels-on-the-YZ-Car.pdf
- ShopBot spindle packages (HSD, Colombo, ER25, RPM controller) — https://shopbottools.com/products/spindles
- ShopBot Installing an HSD Spindle: PRS Alpha / Yaskawa V1000 — https://shopbottools.com/wp-content/uploads/2024/01/HSDSpindleInstallPRSAlpha.pdf
- Oriental Motor AS-Series Connection and Operation (alarm codes) — https://www.orientalmotor.com/products/pdfs/connection/AS-RoHS_connection_operation.pdf
- Oriental Motor AS-Series alphaStep catalog 2012/2013 (closed-loop changeover) — https://www.orientalmotor.com/products/pdfs/2012-2013/A/usa_st_as.pdf
- Yaskawa V1000 Technical Manual (ShopBot-hosted) — https://shopbottools.com/wp-content/uploads/2024/01/V1000.pdf
- Fab Academy UAE 2020: ShopBot feeds/speeds, broken tool with spindle off — http://fabacademy.org/2020/labs/uae/shopbot/shopbot.html
- Fab Academy, R. Shan 2024: cutting setup and 16 in X datum offset — https://fabacademy.org/2024/labs/charlotte/students/richard-shan/lessons/week7/cutting
- ShopBot SBG00171 Settings / Unit Values, Dec 2014 (motors, pinions, steps/in) — https://shopbottools.com/wp-content/uploads/2024/01/SBG-00171-Settings-Unit-Values-2014-12-17.pdf
- ShopBot vacuum hold-down products (Fein Turbo II) — https://shopbottools.com/products/vacuum
- ShopBot blog: Holding Things Down (2006), Fein Turbo III and bowed plywood — https://shopbottools.com/2006/09/09/holding-things-down
- TalkShopBot t-25063: PRSalpha driver fault, damaged cable [indexed excerpt] — https://www.talkshopbot.com/forum/archive/index.php/t-25063.html
- TalkShopBot t-24846: bit slipping ~0.5 in [indexed excerpt] — https://www.talkshopbot.com/forum/printthread.php?page=1&t=24846
- TalkShopBot t-8151: HDU dust packed in Z rack [indexed excerpt] — https://www.talkshopbot.com/forum/archive/index.php/t-8151.html
- TalkShopBot t-2897: worn rack/pinion, Z position errors [indexed excerpt] — https://www.talkshopbot.com/forum/archive/index.php/t-2897.html
- TalkShopBot t-2666: Preview vs Move/Cut mode [indexed excerpt] — https://www.talkshopbot.com/forum/archive/index.php/t-2666.html
- TalkShopBot t-9779: aluminium welding to cutter [indexed excerpt] — https://www.talkshopbot.com/forum/archive/index.php/t-9779.html
- TalkShopBot t-14808: drilling heat / fire with vacuum hold-down [indexed excerpt] — https://www.talkshopbot.com/forum/printthread.php?page=1&t=14808
- Delta VFD-S User Manual, 2008 (ShopBot-hosted) — https://shopbottools.com/wp-content/uploads/2024/01/VFD-S_manual_en.pdf
- HSD AT/MT Operating Manual (Sorotec mirror) — https://www.upload.sorotec.de/doku/manuals/Operating_Manual_HSD_AT-MT.pdf
- 100kGarages: Machining a two-sided 3D model (C3, Z2 workflow) — http://www.100kgarages.com/blog/2017/01/machining-two-sided-3d-model-solidworks
- TalkShopBot t-16772: screws at the collector impeller [indexed excerpt] — https://www.talkshopbot.com/forum/archive/index.php/t-16772.html
- TalkShopBot t-8987: vacuum through MDF, onion skins, blowers [indexed excerpt] — https://www.talkshopbot.com/forum/archive/index.php/t-8987.html
- ShopBot Manually Setting XY Zero Locations (Fixed keypad, C3 offsets) — https://shopbottools.com/wp-content/uploads/2024/01/ManuallySettingXYZeroLocations.pdf
- TalkShopBot t-25095: proximity input mismatch / “move off prox” [indexed excerpt] — https://www.talkshopbot.com/forum/printthread.php?page=1&t=25095
- TalkShopBot t-3077 (2005): Delta VFD speed set at keypad [indexed excerpt] — https://www.talkshopbot.com/forum/archive/index.php/t-3077.html
- ShopBot SBG00338 Installing the Spindle RPM Controller (Yaskawa), 2015 — https://shopbottools.com/wp-content/uploads/2024/01/RPMControllerYaskawa-2015-04-06.pdf
- Autodesk ShopBot OpenSBP post (SA / CN,90 unit check) — https://cam.autodesk.com/posts/post.php?name=shopbot
- ShopBot Desktop Quick-Start (Windows sleep / USB power settings) — https://shopbottools.com/wp-content/uploads/2024/01/DTQuickStartGuide.pdf
- Fab Academy 2025 Reykjavík: computer-controlled machining (plywood settings, Z on bed, tabs) — https://fabacademy.org/2025/labs/reykjavik/students/magnus-petursson/
- Fab Academy 2025 Ísafjörður group: 12 mm birch ply tests 10–18k rpm / 500–4000 mm/min — https://fabacademy.org/2025/labs/isafjordur/group_assignments/group_week07/
- Fab Academy 2023 Akureyri, A. Sæmundsson: 6 mm 2-flute 14 000 rpm 5000 mm/min — https://fabacademy.org/2023/labs/akureyri/students/andri-semundsson/assignments/08_ComputerControlledMachining/
- MIT CBA feeds and speeds table — https://pub.pages.cba.mit.edu/feed_speeds/
- Fab Lab Reykjavík 2016 instructor material: screw clearance rule, Icelandic ShopBot safety manual (C2 requires input 1 indication) — https://archive.fabacademy.org/2016/fablabreykjavik/students/112/Week7LessonsLearned.html
- Easy Composites EB700 tooling board datasheet (cutting data) — https://media.easycomposites.co.uk/datasheets/EC-TDS-EB700-High-Temperature-Epoxy-Tooling-Board-v2.pdf
- Lab notes, University of Iceland PRSalpha, Oct 2026 (RPM after pause, Enter in the Spindle RPM Control window, Fusion post observations) — unpublished
- HÍ PRSalpha local configuration and operating procedures, October 2026 — unpublished
- Lab photographs of the HÍ PRSalpha, Oct 2026 (control-box, motor, spindle and VFD nameplates; wall-mounted pendant; cabinet rotary disconnect; ground clip on the carriage plate) — unpublished
Manual tags: AG Assembly Guide 2022 [2] · QS Quick Start 2016 [4] · UG User Guide 2015 [11] · CR Command Reference 2015 [10] · HD Holding Down [12] · MS Maintenance Schedule [13] · TM Troubleshooting Mechanicals [16] · XY Manually Setting XY Zero [47] · FAQ Z-zero plate [6].